Provide structural repairs to timber piles on trestle Railway Bridge over San Dieguito River, Del Mar, CA. Constraints: Trestle is used daily by North County Transit Districts “Coaster” commuter train. Service cannot be interrupted.
A Redesign and rebuild of the 6,300 square feet of docks and finger piers using New Bedford Technology- FiberForce® HDPE Plastic Lumber.
Trident Seafoods fish processing facility, a 45,000 sq ft plant built over 60 years ago in Ketchikan, Alaska is situated on timber piles. Many piles had deteriorated through age and marine borers.
Come up with a viable replacement to the existing steel camels being used by Cruise Terminals of America (CTA) and the Port of Seattle at Terminal 91-Seattle.
Mitigate highway construction and city development projects prior to impacts on 130+ acres of wetlands and other aquatic resources. Provide an environmentally-sensitive interpretive boardwalk trail.
This residential dock was completely deteriorated through age and the elements. The timber piles and dock surface needed replacement.
The US Navy in San Diego, California, needed to upgrade shipyard berthings at its Point Loma Naval Submarine Base. The upgrade included installation of Sub-Fenders and HarborCamel, the latter of which spread the weight of a vessel to ensure that no individual pile or point on a dock is stressed while the vessel is docked.
Structural Recycled Plastic lumber is available in filament reinforced or rebar reinforced or a combination of both. Sizes from 2X2 up to 12X12 and larger including round profiles are available and in a wide range of colors.
All construction was completed in late December 2011, and that construction history from mid-May 2011 to early January 2012.
The US Navy sought to install standoffs for lightweight naval vessels at the Naval Weapons Station at Seal Beach, CA.